Click here to find your local Sales Manager
Or search by zip code:  
 
Latest News:

Underground Solutions Awarded Cuyahoga Co. Water Main Replacement Project in Cleveland, OH for Fusible C-900® and Duraliner™

In March 2007, Underground Solutions, Inc. (UGSI) was contracted by Fabrizi Trucking & Paving of Middleburg Heights, OH to provide UGSI's Fusible C-900® pipe and fusion services for a water main horizontal directional drill conducted by Precision Directional Boring of Brunswick, OH. UGSI's Duraliner™ pipeline rehabilitation system will also be installed to rehabilitate 2 sections of 12" cast iron water main along rail road tracks intersecting with Berea Road. UGSI will complete their portion of the work in April 2007.

Pipeline Details and Project Summary
  • Project:
  • Location:
  • Length:
  • Pipe size:
  • Installation:
  • UGSI Contact:
  • Cuyahoga County, OH Berea Road
  • Water Main Replacement Project
  • Cleveland, OH
  • 350 LF Fusible C-900® and 600 LF Duraliner™
  • 12" DR 18
  • Horizontal directional drill and Duraliner™
  • Chet Allen - (724) 321-1514 callen@undergroundsolutions.com

UGSI's Fusible C-900® pipe was selected for its ability to provide Cuyahoga County with a fully restrained, gasketless C900 water pipe that could be directionally drilled in highly developed areas. Cuyahoga County also welcomed the use of Duraliner™ due to their need for a structural renewal of their existing 12" cast iron main that maximizes the flow capability of the existing host pipe. Reconnections to the Fusible C-900® and Duraliner™ will be made with standard MJ fittings.

For additional project information, contact Chet Allen.


Horizontal directional drilling wth Fusible C-900®


Duraliner™ Pipeline Rehabilitation System